Inspection Smoke Control Systems (RCS)
Receive a quote tailored to your needs
Construction works must comply with regulations outlined in the Bouwbesluit. If compliance cannot be achieved, it is possible to provide an equivalent interpretation to the Bouwbesluit requirements. This can be substantiated in various ways, such as application of smoke control systems.
Smoke control systems could, for example, consist of smoke and heat venting system, pressurisation systems or longitudinal ventilation and impulse ventilation systems. Each of these systems has its own application range, but share a common objective: to ensure that a smoke-free escape egress is created within a building structure - for example in office buildings and car parks.
CCV Inspection Scheme
A smoke control system in a building structure must be certified based on the CCV Inspection Scheme for smoke control systems as stipulated by the Bouwbesluit. Kiwa FSS assesses the system in combination with other associated systems as well as structural and organizational measures in order to obtain a certificate of smoke control system based on the CCV Scheme. We are accredited by the Raad voor Accreditatie (RvA) (‘Accreditation Council’) to conduct RCS inspections, which assures our expertise and independence.
Why Kiwa Fire Safety & Security?
Kiwa Fire Safety & Security (Kiwa FSS) is a leading testing, inspection and certification (TIC) company, focusing on products, installations and companies in the field of fire and burglary protection. Kiwa FSS provides services in an expert, flexible, customer-oriented and innovative manner. These services include conducting inspections, certifying (fire) security companies, testing products and providing training from a fully independent, objective and integral position.
Your Inspection Conducted by Kiwa FSS Inspection
Read below which steps the inspection process consists of, up to and including the issuance of the inspection certificate.
Request for an Inspection
Would you like your (fire protection) system to be inspected by Kiwa FSS Inspection? If so, please contact us.
Quotation Acceptance
You will receive a quotation outlining the agreements and conditions applicable to the inspection. Once the signed quotation has been returned, the inspection process will be initiated.
Inspection Scheduling
After the quotation has been signed by both parties, the Kiwa FSS Planning Department will contact you to schedule the inspection. Following the appointment, you will receive a confirmation containing the details of the planned inspection.
Inspection Execution and Reporting
During the inspection, it will be determined whether the fire protection system complies with the applicable requirements. After completion of the inspection, the inspector records the findings and any non-conformities in an inspection report.
Review of the Inspection Report
The inspection report and its conclusion are subsequently reviewed to ensure the completeness, accuracy, and consistency of the assessment.
Non-Conformities and Corrective Actions
If deficiencies are identified, appropriate corrective actions must be implemented. These actions must be documented and supported with the necessary evidence, which is submitted to the inspector for review. Once the deficiencies have been resolved, the inspector will assess whether they can be closed. This assessment may be carried out administratively or through a re-inspection.
Decision on the Issuance of the Inspection Certificate
If the inspection results in a positive conclusion, an inspection certificate will be granted.
Issuance of the Inspection Certificate
Following a positive certification decision, the organization will receive the inspection report together with the corresponding inspection certificate.
Inspection Fire alarm and Evacuation Alarm Systems
In case of fire, fire alarm and evacuation alarm systems are crucial for the safety of occupants in a building and minimising damage. Kiwa FSS is the expert for inspection and certification of fire alarm systems and evacuation alarm systems, see here for more information!
K21045 Fire Protection Systems
The K21045 Fire Protection Systems Assessment scheme is a scheme for Testing, Inspecting and Certification (TIC) Fire Protection Systems.
Quick scan Fire Safety in Buildings
Kiwa FSS’s quick scan Fire Safety in Buildings is an independent investigation to determine the current status of fire safety precautions.
Inspection PGS 15 Publicatie reeks Gevaarlijke Stoffen (Publication Series on Hazardous Substances)
Guideline 15 from the Publication Series on Hazardous Substances (PGS) contains guidance for the storage of packaged hazardous goods. Kiwa FSS can assess the fire safety aspects in your storage facility during an inspection PGS 15, including from baseline inspection to PGS 15 certification and follow-up inspection.
NTA 8133 test Lithium Fire Extinguishers
In order to be sold on the Dutch market, portable fire extinguisher must have the Dutch Approval Mark (Dutch: Rijkstypekeur). Test methods for different fire classes are included in EN 3-7. However, there is currently no designated test method for lithium fire extinguishers in EN 3-7. That is why Kiwa offers lithium fire extinguisher testing according to the Dutch Technical Agreement NTA 8133.
Test/Measuring Trailer for Water-Based Extinguishing Systems Water Supply Capacity
The water supply capacity of water-based extinguishing systems shall be checked periodically to confirm whether the required capacity is still available. Kiwa R2B has a custom build test/measuring trailer equipped with a calibrated capacity meter and auxiliary hoses and fittings.
K21045 SCP06 Fire Protection of Livestock in Stables Based on Water Mist Systems
The Specific Certification Programme SCP06 Fire Protection of Livestock in Stables based on Water Mist includes a test protocol designed to demonstrate the effectiveness of a fire protection system based on water mist in stables. SCP06 is implemented in accordance with the test, inspection, and certification scheme K21045 Fire Protection Systems and contains the requirements applied by Kiwa when applying for a product certificate.
Air Permeability Test Reporting
Gaseous fire extinguishing systems are often used as a fire protection system. As a fire safety expert, Kiwa FSS can measure the air permeability of a room and thus determine the effectiveness of the extinguishing system.
Inspection Foam Extinguishing Protection - Foam Extinguishing System
As an experienced partner in fire safety, Kiwa Fire Safety & Security (Kiwa FSS) applies a comprehensive approach to all relevant aspects of your foam extinguishing protection during a Foam Extinguishing System Inspection.
Inspection CO/LPG Detection System
Standard (operating) conditions in motor vehicles parkings and storage garages can create an unsafe environment for occupants due to exhaust fumes or leaks. Carbon monoxide (CO) and LPG detection is one of the measures that can contribute to a safe environment for occupants.